buttons
   
 
 
  BACK

    Ground survey has been done.
     
  Necessary measurements have been done and borders have been determined.
 
 
 
 
    Rather than laying the foundation right away, the soil has been dug for 1 m to create a subbase.
             
    The cavity has been filled with rocks and concrete has been poured in order to have a stronger foundation.
             
    Iron has been laid down.
             
    Pipes have been laid down.
             
    The shell has been completed.
             
    The roof shell has been completed.  
         
    Walls have been built.  

 
 
Genel Genel